Zhejiang Hanmu Electromechanical Equipment Manufacturing Co., Ltd. plans to apply for the completion and acceptance of environmental protection facilities

2020-07-07 16:15

According to the environmental protection laws and policies of the construction project, the completion acceptance status of the environmental protection facilities of the newly added stacker spraying line of Zhejiang Ham Electromechanical Equipment Manufacturing Co., Ltd. is announced as follows:

1. Project name: Zhejiang Hanmu Electromechanical Equipment Manufacturing Co., Ltd. newly added stacker truck spray line supplement project

2. Construction unit: Zhejiang Hanmu Mechanical and Electrical Equipment Manufacturing Co., Ltd.

3. Construction site: No. 65, Zhijiang Road, Haining Agricultural Development Zone

4. Construction content: Completion and acceptance of the new stacker spraying line re-organization project of Zhejiang Hanmu Electromechanical Equipment Manufacturing Co., Ltd.

V. Implementation of environmental protection: overall coordination of pollutant compliance and total amount control

6. Acceptance monitoring results:

In November 2016, Hangzhou Bosheng Environmental Protection Technology Co., Ltd. conducted on-site monitoring of the new stacker truck spraying line reissue project of Zhejiang Ham Electromechanical Equipment Manufacturing Co., Ltd., and compiled a completed environmental protection acceptance monitoring report (form) (document number) ). According to the monitoring, the main results of the completed environmental protection acceptance monitoring report are as follows:

(1) Working conditions during the monitoring period: normal operation of the equipment

(2) Wastewater: (1) Clean and sewage diversion, rain and sewage diversion.

(2) Domestic sewage is pretreated by septic tanks and discharged into the municipal sewage pipe network.

(3) Exhaust gas: meet the emission standard of "Industrial Furnace Air Pollutants Emission Standard" (GB9078-1996), and have no impact on the surrounding environment

(4) Noise: Hangzhou Bosheng Environmental Protection Technology Co., Ltd. conducted a noise value measurement (equipment normal operation) around the project plant boundary on January 19 (14:00-15:00) and found that the noise value around the plant boundary was average It can meet the requirements of Class 3 standard limits in the "Acoustic Environmental Quality Standard" (GB3096-2008).

(5) Solid waste: 1. Comprehensive utilization by relevant enterprises for takeaway after collection

2. The transportation and sanitation department will be cleared and handled uniformly

(6) Total amount control: The main pollutants included in the total amount control in the pollution factors emitted by this project are CODCr and NH3-N. According to the "Approval Measures for the Total Access of Major Pollutants for Construction Projects in Zhejiang Province (Trial)": New, reconstruction, and expansion projects do not discharge production wastewater, and the main water pollutants discharged only originate from domestic wastewater discharged from independent living areas in the plant Yes, its new chemical oxygen demand and ammonia nitrogen can be reduced without regional substitution. Since the sewage treatment plant discharge standard in Haining area has been upgraded to Level 1 A, after the implementation of this project, the total recommended values ​​of CODCr and ammonia nitrogen are 0.0675 t/a and 0.00675 t/a respectively, and there is no need to carry out total regional substitution reduction. The SO2 and NOx control values ​​are 0.00085t/a and 0.102t/a, respectively, and the required doses are 0.0017t/a and 0.204t/a respectively. The total amount is adjusted and balanced throughout Haining City.

Publicity time: April 26-April 30, 2017 (5 working days in total)

If the public has comments and suggestions on the construction project, they can report to the following units within the publicity period. Please leave your contact information (name, address, phone number or email) in response to questions in order to get answers and feedback in time.

Haining Environmental Protection Bureau, Tel: 12369;

High-tech Zone, Chang'an Town, Tel: 87429016;

Jiaxing Zhongyi Testing and Research Institute Co., Ltd., Tel: 0573-82808856, Fax: 0573-82082121.

Construction unit: Zhejiang Hanmu Mechanical and Electrical Equipment Manufacturing Co., Ltd.

Date: April 26, 2017

Previous None
Previous : None
订购

Order

Strict quality control

快速发货

Fast delivery

Dedicated transportation

服务

Service

24 hours to answer you

Zhejiang Heirrmu Mechanical and Electrical Equipment Manufacturing Co.,Ltd

We sincerely look forward to cooperating with customers sincerely, and returning customers' satisfactory quality and service.

7X24 National Customer Service Phone

Wechat

Home         |          Machinery Products         |          Rental service         |          News         |          FAQ         |          About us         |          Contact us

COPYRIGHT © 2020 Zhejiang Heirrmu Mechanical and Electrical Equipment Manufacturing Co., Ltd 浙ICP备20018077号