heirrmu

News Center

The company adheres to the tenet of "Seek Quality and Dedicated Service"

Check category
>
>
Company news

News Center

07-07

Zhejiang Hanmu Electromechanical Equipment Manufacturing Co., Ltd. plans to apply for the completion and acceptance of environmental protection facilities

According to the environmental protection laws and policies of the construction project, the completion acceptance status of the environmental protection facilities of the newly added stacker spraying line of Zhejiang Ham Electromechanical Equipment Manufacturing Co., Ltd. is announced as follows: 1. Project name: Zhejiang Hanmu Electromechanical Equipment Manufacturing Co., Ltd. newly added stacker truck spray line supplement project 2. Construction unit: Zhejiang Hanmu Mechanical and Electrical Equipment Manufacturing Co., Ltd. 3. Construction site: No. 65, Zhijiang Road, Haining Agricultural Development Zone 4. Construction content: Completion and acceptance of the new stacker spraying line re-organization project of Zhejiang Hanmu Electromechanical Equipment Manufacturing Co., Ltd. V. Implementation of environmental protection: overall coordination of pollutant compliance and total amount control 6. Acceptance monitoring results: In November 2016, Hangzhou Bosheng Environmental Protection Technology Co., Ltd. conducted on-site monitoring of the new stacker truck spraying line reissue project of Zhejiang Ham Electromechanical Equipment Manufacturing Co., Ltd., and compiled a completed environmental protection acceptance monitoring report (form) (document number) ). According to the monitoring, the main results of the completed environmental protection acceptance monitoring report are as follows: (1) Working conditions during the monitoring period: normal operation of the equipment (2) Wastewater: (1) Clean and sewage diversion, rain and sewage diversion. (2) Domestic sewage is pretreated by septic tanks and discharged into the municipal sewage pipe network. (3) Exhaust gas: meet the emission standard of "Industrial Furnace Air Pollutants Emission Standard" (GB9078-1996), and have no impact on the surrounding environment (4) Noise: Hangzhou Bosheng Environmental Protection Technology Co., Ltd. conducted a noise value measurement (equipment normal operation) around the project plant boundary on January 19 (14:00-15:00) and found that the noise value around the plant boundary was average It can meet the requirements of Class 3 standard limits in the "Acoustic Environmental Quality Standard" (GB3096-2008). (5) Solid waste: 1. Comprehensive utilization by relevant enterprises for takeaway after collection 2. The transportation and sanitation department will be cleared and handled uniformly (6) Total amount control: The main pollutants included in the total amount control in the pollution factors emitted by this project are CODCr and NH3-N. According to the "Approval Measures for the Total Access of Major Pollutants for Construction Projects in Zhejiang Province (Trial)": New, reconstruction, and expansion projects do not discharge production wastewater, and the main water pollutants discharged only originate from domestic wastewater discharged from independent living areas in the plant Yes, its new chemical oxygen demand and ammonia nitrogen can be reduced without regional substitution. Since the sewage treatment plant discharge standard in Haining area has been upgraded to Level 1 A, after the implementation of this project, the total recommended values ​​of CODCr and ammonia nitrogen are 0.0675 t/a and 0.00675 t/a respectively, and there is no need to carry out total regional substitution reduction. The SO2 and NOx control values ​​are 0.00085t/a and 0.102t/a, respectively, and the required doses are 0.0017t/a and 0.204t/a respectively. The total amount is adjusted and balanced throughout Haining City. Publicity time: April 26-April 30, 2017 (5 working days in total) If the public has comments and suggestions on the construction project, they can report to the following units within the publicity period. Please leave your contact information (name, address, phone number or email) in response to questions in order to get answers and feedback in time. Haining Environmental Protection Bureau, Tel: 12369; High-tech Zone, Chang'an Town, Tel: 87429016; Jiaxing Zhongyi Testing and Research Institute Co., Ltd., Tel: 0573-82808856, Fax: 0573-82082121. Construction unit: Zhejiang Hanmu Mechanical and Electrical Equipment Manufacturing Co., Ltd. Date: April 26, 2017
07-07

112th Canton Fair

112th Canton Fair
07-07

Share the introduction of our aerial work platform rental service

We focus on leasing business No big money needed Investment in leasing equipment does not require a large sum of money, and the money can be used where investment is more needed Reduce idle time Lease only when you need it, pay it back when you don’t need it No maintenance cost Maintenance costs are included in the rent, no need to purchase spare parts, no maintenance workshops and spare parts inventory, no regular maintenance, no monthly depreciation costs No big money needed You don’t need to invest large sums of money to invest in leasing equipment, and you can use the money in places that require more investment to reduce idle time. Leasing is only rented when you need it, and you don’t need to pay it back. Old cost The only cost per month is rent, no other carrying costs No placement cost There is no need to invest in the site fee for leasing, and no need to pay any site maintenance fees. No disposal costs Leasing does not need to worry about how to sell the equipment before the end of its useful life, including equipment cleaning, advertising and meeting buyers, etc. The right equipment Lease ensures that you find the right equipment needed for the job so that the job is done safely and properly More accurate cost accounting The only cost of leasing is rent, thus simplifying the work of bidding, spending expenses and preparing accounts The advantages of the empty work platform: Simple operation, complete procedures, high work efficiency, large operating radius, fast transfer speed, flexible lease period (daily rent, weekly rent, monthly rent, annual rent), the rent is lower than similar products, the safety factor is high, and the working conditions are restricted Because of its few advantages, it is unanimously recognized by many high-altitude users. Currently available vehicle heights: 3 meters, 4 meters, 6 meters, 7.5 meters, 9 meters, 11 meters, 12 meters. Applicable scope: Exterior wall repair, installation, painting, transformation, LED billboard installation, monitoring installation, equipment installation, flagpole maintenance, street lamp maintenance, viaduct spraying, downpipe installation, film and television shooting, road and bridge tunnel gas station inspection and maintenance, glass curtain wall installation, cleaning, smoke Halogen anticorrosion, maintenance of high pole lights, tree pruning, plant fire equipment installation, steel structure installation, industrial equipment installation, high-speed rail and light rail maintenance, high-altitude rescue, factory scene shooting, etc. Maintenance of stadiums and exhibition venues.
Previous page
1
订购

Order

Strict quality control

快速发货

Fast delivery

Dedicated transportation

服务

Service

24 hours to answer you

Zhejiang Heirrmu Mechanical and Electrical Equipment Manufacturing Co.,Ltd

We sincerely look forward to cooperating with customers sincerely, and returning customers' satisfactory quality and service.

7X24 National Customer Service Phone

Wechat

Home         |          Machinery Products         |          Rental service         |          News         |          FAQ         |          About us         |          Contact us

COPYRIGHT © 2020 Zhejiang Heirrmu Mechanical and Electrical Equipment Manufacturing Co., Ltd 浙ICP备20018077号